2500L-5000L Vacuum Homogenizing Emulsifier Mixer with Oil Phase Pot and Water Phase Pot for Cream, Lotion, Shampoo, Shower Gel, Sauce and Mayonnaise

Factory Direct Customizable OEM / ODM Available Video Inspection Available Lifetime Technical Support
CE Certified GMP Design FDA Contact Parts

The 2500L Vacuum Emulsifying Mixer is a fixed-head batch processing system for compatible creams, lotions, shampoo, shower gel and emulsified sauces. A 2500L working-capacity main vessel combines scraped agitation and bottom-entry homogenization with separate oil and water phase preparation. Within the vacuum emulsifying mixers range, this steam-heated configuration provides a larger-batch platform with Siemens PLC/HMI control and a layout customized around your production process.

Working Capacity (L)
2500
Main Tank Mixer Type
Gate Agitator + Single/Dual Fixed Paddles
Homogenizer Speed (rpm)
0–3000 rpm (Variable Speed)
Contact Material
SUS316L Stainless Steel

Product Overview

This system brings phase preparation, vacuum charging, emulsification and thermal processing into one coordinated production arrangement. The main vessel provides 2500L working capacity within a 3000L total volume. The specified minimum batch is 500L. A 1000L oil phase pot and a 2000L water phase pot support separate preparation before ingredients enter the main vessel.

Production teams can prepare the two phases in parallel, then follow the formulation’s addition order rather than combining everything at once. The main gate agitator maintains bulk movement while the bottom-entry homogenizer supplies high shear during the required processing stage. Operators supervise ingredient loading, process settings, additions and product release through the Siemens control interface.

This model belongs to the fixed-type vacuum emulsifying mixer family. Its main head remains fixed; the separate hydraulic platform provides personnel and material access. Steam heating is selected for all three vessels, with the generator sized around their combined operating demand.

StriversMachinery builds the project around your formulation, utilities and factory layout. The configuration described here is a reference design for a custom-built system; vessel proportions, controls, handling arrangements and supporting equipment can be adapted during engineering.


Technical Specifications

Total Capacity (L)3000
Working Capacity (L)2500
Min Batch Size (L)500
Structure TypeTriple Layer (with Jacket & Insulation)
Contact MaterialSUS316L Stainless Steel
Non-contact MaterialSUS304 Stainless Steel
Surface FinishInterior Mirror Polish (Ra ≤ 0.4 μm) & Exterior Satin/Matte Finish
Temperature RangeWater up to 98°C | Steam up to 120°C | Thermal Oil up to 200°C
Jacket Design Pressure (MPa)0.3
Main Tank Mixer TypeGate Agitator + Single/Dual Fixed Paddles
View All SpecificationsShow Fewer Specifications
Mixing Speed (rpm)0–63 rpm
Mixing Motor Power (kW)5.5
Frequency ControlVariable Speed with VFD (Delta, Siemens, ABB, Schneider, Optional)
Scraper SystemWall-Scraping PTFE Scrapers
Homogenizer PositionBottom-entry Homogenizer
Homogenizer TypeHigh Shear Stator-Rotor Homogenizer
Homogenizer Power (kW)22
Homogenizer Speed (rpm)0–3000 rpm (Variable Speed)
Max Processing Viscosity (mPa·s / cP)50,000
Heating MethodElectric Heating via Jacket / External Steam Heating (Optional)
Cooling SystemTap Water / Cooling Tower Circulation (Chilled Water / Glycol Circulation Optional)
Water ChillerExternal Water Chiller Unit (Optional)
Temperature Control Accuracy±1°C
Vacuum Degree (MPa)-0.09
Vacuum Pump BrandHigh-quality domestic/joint venture brands
Discharge MethodBottom Valve Discharge (Optional Rotor Pump) / Bottom Valve Discharge (Optional Air Pressure Assist) / External Pump Transfer System
Discharge ValvesBall Valve
Mechanical Seal BrandDouble Mechanical Seal (EagleBurgmann)
Types of Upper HeadsFixed Top Head
Top Openings & AccessoriesVacuum Port / Vacuum Feeding Port / Powder Feeding Port / Liquid Inlet / Fragrance Addition Port / Manway / Sight Glass with Wiper / LED Inspection Light / CIP Spray Ball / Vent Filter / Vacuum Gauge / Pressure Sensor / Compressed Air Inlet
Motor BrandABB / Siemens
Connection TypeTri-Clamp
Oil & Water PotEquipped with Integrated Oil & Water Pre-treatment Pots
Oil & Water Pot Capacity (L)Oil: 1000 L / Water:2000 L
Platform & LadderSUS Anti-slip Platform with Guardrails & Ladder
VoltageConfigurable to local grid (110V–480V, 50/60Hz, Single or 3-Phase)
Total Power (kW)49
Drive TypeElectric
Installation TypeFloor-Standing
Automation LevelFully Automatic
Electrical ComponentsSchneider / ABB / Siemens / Omron / Fuji /Mitsubishi (Optional)
Control SystemPLC + HMI Touch Screen Control
PLC SystemSiemens
HMI / Touch ScreenSiemens
Machine Weight (kg)5000

Ordering & Delivery

Warranty24 MonthsPayment Terms40% T/T Deposit, 60% Balance Before Shipment (Alibaba Trade Assurance Available)
Lead Time15–20 Working DaysPackagingStandard Export Fumigation-Free Wooden Case
OEM / ODM Service100% Customizable / Engineering Support Available

Machine Configuration

ComponentConfiguration and function
Main processing vessel3000L total volume; 2500L working capacity; specified minimum batch 500L; fixed top head; jacket and insulation.
Agitation5.5kW gate agitator, 0–63rpm variable speed, PTFE wall scrapers and two fixed baffles; horizontal geared drive.
Homogenization22kW bottom-entry rotor-stator homogenizer, 0–3000rpm variable speed; EagleBurgmann double mechanical seal.
Phase preparation1000L oil phase pot and 2000L water phase pot, each with bottom disperser, temperature probe and baffles.
Heating supplySteam heating for the main vessel and both phase pots. The reference arrangement normally uses one suitably sized steam generator; generator rating is selected for the project.
CoolingJacket cooling using tap water or cooling-tower circulation; chilled-water arrangements can be selected during customization.
Vacuum and feedingVacuum pump, vacuum connection, vacuum gauge and ingredient-charging provisions; pneumatic valves on the vacuum-feeding and fragrance-addition ports.
Main-head fittingsManway, observation provisions, inspection light, vent provision, pressure instrumentation, compressed-air inlet, spare connection and rotating cleaning spray ball.
ControlSiemens PLC and Siemens touchscreen HMI; variable-speed and timer settings, temperature display, vacuum control, disperser switching, pneumatic-valve actuation and alarm display.
Product-contact constructionSUS316L product-contact metal construction; inner mirror polish specified at Ra ≤ 0.4μm; PTFE scraper blades.
External constructionSUS304 non-contact construction with satin/matte finish; lug-supported main vessel.
DischargeBottom ball valve in the reference configuration; rotary lobe pump and pressure-assisted discharge are separately selected options.
Access structureOperating platform, stairs/ladder and guardrails; separate hydraulic access platform for personnel and materials, subject to the approved platform specification.
Piping and fittingsSupplied system piping for steam, product/process water, compressed air, cooling circulation and drainage, together with the specified traps, solenoid valves and pneumatic fittings.
Electrical loadListed equipment power: 49kW, excluding the steam generator. Final connected load follows the agreed configuration and electrical schedule.

Key Features

  • Separate oil and water phase pots allow phase preparation to overlap where the formulation permits.
  • PTFE wall scrapers return wall-adjacent material to the moving batch during agitation.
  • Two fixed baffles interrupt bulk rotation within the main processing vessel.
  • Bottom-entry rotor-stator homogenization supplies high shear independently of the gate agitator.
  • Steam-heated jackets support coordinated thermal processing across the three-vessel arrangement.
  • Vacuum charging provisions support ingredient transfer through defined, valved connections.
  • Siemens PLC/HMI brings process settings, valve operation and alarms into one operator interface.
  • Fixed-head access fittings provide charging, observation and cleaning connections without routine head lifting.
  • A separate hydraulic platform supports personnel and material movement beside the operating structure.
  • Bottom ball-valve discharge provides a defined outlet for the selected downstream transfer arrangement.

Applications


Working Principle

Production starts with the ingredients assigned to each preparation stage. Water-phase and oil-phase materials enter their respective pots, where the bottom dispersers incorporate the ingredients. Steam supplies heat through the jackets while the temperature probes provide readings for the operator. The order of loading and heating follows the formulation.

The main vessel’s vacuum system lowers the internal pressure for the selected charging stage. Prepared phases are transferred through the arranged product connections under the pressure difference where their flow properties permit. Pneumatic valves control the specified feeding ports. Powder introduction and fragrance addition use their designated connections at the appropriate stage, rather than following a universal addition sequence.

Inside the main vessel, the gate agitator moves the bulk product past the fixed baffles. PTFE scrapers sweep the wall-adjacent material. When homogenization is required, the bottom rotor-stator head subjects material passing through its working zone to high shear, supporting dispersion and droplet breakup. The agitation and homogenization speeds serve different process functions and can be adjusted separately.

Vacuum treatment can support removal of entrained air during suitable stages. Its timing must account for temperature, foaming and volatile ingredients. Cooling water then circulates through the jacket as required by the process. Finished product leaves through the bottom ball valve, with an optional transfer pump or engineered pressure-assisted arrangement when selected. The spray ball supports the subsequent cleaning procedure.


Product Video

Video not playing? Watch on YouTube.


Why Choose This Machine

  • A coherent route for larger batches. The 2500L working-capacity vessel provides a production option when repeated smaller batches create handling and scheduling pressure, while retaining separate phase preparation.
  • Preparation can be planned around the recipe. The oil and water pots let teams organize melting, dissolution and premixing before main-vessel processing, instead of treating every ingredient as a direct main-tank addition.
  • Bulk movement and high shear have separate roles. Independent drives let the process use wall scraping and homogenization at different stages, including stages where additional shear is unnecessary.
  • Controls can follow the operating method. Siemens PLC/HMI provides a basis for the agreed valve actions, timing and operator interface, with the automation scope tailored to production requirements.
  • Access planning includes material movement. The fixed operating structure and separate hydraulic platform can be arranged around charging and personnel access, reducing the need to improvise handling routes after installation.
  • Transfer can match the receiving operation. The bottom outlet can be combined with a selected pumping or pressure-assisted solution according to the product and downstream layout.

Optional Upgrades & Configurations

Rotary lobe pump discharge or a separately engineered external product-transfer arrangement.
Pressure-assisted discharge with the vessel, safeguards and pressure settings specified for that duty.
External water chiller and a compatible chilled-water or glycol cooling circuit.
Alternative heating arrangements, including electric jacket heating, where selected instead of the described steam-heated design.
Customized main-vessel capacity, phase-pot sizes and vessel proportions.
Customized operating platform, personnel/material lifting arrangement and piping layout.
HMI language, process sequence, valve-control scope and level of automation adapted to the production method.
Motor, VFD and electrical-component selections agreed for the destination and project.
Further functional changes can be developed around the product and process requirements; the final specification defines the engineered solution and supply scope.

Installation Requirements

Electrical Supply: Configured for the destination voltage, phase and frequency.
Listed Equipment Power: 49kW, excluding the steam generator.
Heating Supply: Steam for the main vessel, oil phase pot and water phase pot; normally one project-sized steam generator.
Compressed Air: Supply for the pneumatic valves.
Process Water: Water quality suitable for the formulation.
Cooling Water: Tap-water or cooling-tower circuit, or a selected chilled-water arrangement.
Cleaning Water: Supply to the agreed cleaning connections.
Drainage: Connection for cleaning discharge and the specified utility drains.
Installation Base: Load-bearing floor or foundation sized for the installed operating loads.
Access: Working clearance for the fixed-head vessel, phase pots, operating structure, hydraulic platform and maintenance tasks.

Frequently Asked Questions

What is the 2500L Vacuum Emulsifying Mixer supplied as?
It is a custom-built processing system based on a main vacuum vessel, separate oil and water preparation pots, steam heating, Siemens PLC/HMI control and an operating structure. This page describes a reference configuration. The final project specification defines the functions, equipment interfaces and supply scope.
Can the functions and layout be customized?
Yes. Capacity, phase-pot proportions, heating and cooling, controls, valve operation, access structures and transfer arrangements can be adapted around the production requirement. Further functional changes are developed during engineering, with the agreed design reflected in the final technical documents.
Are the three vessel capacities added together to give the batch size?
No. The main vessel has 2500L working capacity and 3000L total volume. The 1000L oil pot and 2000L water pot prepare ingredients for transfer. Their contents must be scheduled against the actual recipe and available capacity in the main vessel.
Can this configuration process a 500L batch?
The supplied minimum-batch specification is 500L. The intended formulation still needs adequate contact with the agitation and homogenization zones. When small batches are frequent, include that operating point in the trial rather than evaluating only the full working volume.
Does steam heating require three steam generators?
No. The usual arrangement uses one appropriately sized generator serving the required heating duties. Its rating is selected around simultaneous phase preparation, main-vessel demand and the intended schedule. A different steam-supply arrangement can be engineered for the project.
View All FAQs (18)Show Fewer FAQs
Does the listed 49kW include steam generation?
No. The listed 49kW equipment power excludes the steam generator. Any electric generator adds its own connected load. The final electrical schedule should cover the selected generator and other agreed auxiliary equipment.
Does the hydraulic platform lift the main vessel head?
No. The described main head is fixed. The separate hydraulic platform is for personnel and material access. Its dimensions, load rating, travel and protective arrangement are selected according to the approved lifting duty and factory layout.
Is discharge through a pump included in the reference configuration?
The reference outlet is a bottom ball valve. A rotary lobe pump or other external transfer arrangement can be selected for the product and receiving equipment. Pressure-assisted discharge is also an engineered option; the vessel pressure duty must be specified separately.
Can the mixer make both cream and shampoo?
Compatible formulations can be evaluated for this system, but they need different processing methods. A cream may need staged phase preparation and homogenization, while a shampoo may require controlled incorporation and less shear during particular stages. The operating sequence should follow the formulation.
Is the maximum viscosity specification enough to approve a product?
No. The listed reference value is 50,000cP, but product behavior depends on temperature, shear history, yield characteristics and batch size. Supply the viscosity conditions and a representative product so that mixing, cooling and discharge can be assessed together.
Does a higher homogenizer speed always improve the finished emulsion?
No. The required shear depends on the formulation and stage of production. Additional shear can introduce heat or change shear-sensitive structures. Select speed and duration from trials that examine the required texture and product performance.
Does vacuum remove every bubble and guarantee shelf stability?
Vacuum treatment supports removal of entrained air under suitable conditions. Final air content, texture and stability also depend on the formulation, processing sequence and downstream handling. Define the required product tests instead of relying on vacuum level alone.
Does Siemens PLC control mean the system operates without staff?
No. The specified interface controls process settings and the agreed equipment actions. Operators still handle the assigned loading, supervision, additions and release tasks. The extent of automatic sequencing is customized rather than inferred from the presence of a touchscreen.
Can one steam generator heat all three vessels at the same time?
That can be the design objective, but available steam output must match the simultaneous demand. Provide the batch schedule and heating duties so that generator capacity and steam distribution are selected together. A generator count alone does not define heating performance.
Is the spray ball a complete automatic CIP system?
The rotating spray ball is a cleaning provision. A complete cleaning process also depends on media supply, flow, return or drainage, coverage and access to the product-contact path. Cleaning automation and verification requirements can be developed as part of the project.
Can the line produce smooth sauce and mayonnaise?
These are intended application categories for compatible formulations. Review oil proportion, addition order, temperature, ingredient acidity and any solid particles before specifying the process. Food-product suitability must address the complete contact path and cleaning method.
What should be tested before accepting a 2500L installation?
Use representative formulations and the intended batch range. Agree the observations and acceptance criteria for phase preparation, mixing uniformity, temperature behavior, entrained air, discharge and cleaning access. Include the actual receiving arrangement where transfer affects finished-product quality.
What technical support is available after delivery?
StriversMachinery provides free remote technical support, including operation guidance and troubleshooting. On-site installation, commissioning, training and maintenance services can be arranged under the project agreement. Remote support and any separately arranged site work should be defined clearly.

Ready to Get a Quote?

Contact our team directly for pricing, customization options, and delivery timelines.

💬 WhatsApp Us Now
This field is required.
This field is required.
If you are not sure, just tell us what products do you produce.
This field is required.
Please check the box to confirm you agree to our Privacy Policy and Cookie Policy before submitting.

After-Sales & Technical Support

Common Problems

During operation, observable symptoms may include a slow vacuum drawdown, loss of vacuum during charging, interrupted transfer from a phase pot, visible powder lumps, uneven texture or a persistent surface foam layer.
A batch may take longer than its established heating or cooling pattern, or the indicated temperature may fluctuate unexpectedly.
Operators may notice an unusual change in drive noise, vibration or displayed load, material remaining on the vessel wall, leakage near a seal or valve, or slow discharge into the receiving equipment.
Pneumatic valves may fail to reach the commanded position, and the HMI may display an alarm or an unexpected process state.
Record when each symptom appears, the product being processed and the last normal stage so that troubleshooting starts from an identifiable observation.

Troubleshooting

Problem: The main vessel does not reach or hold the expected vacuum.
Possible Cause: An open connection, leaking access seal or valve, or insufficient vacuum-pump performance.
Recommended Solution: Inspect the valve lineup and accessible seals first. Compare the vacuum reading with the last normal run, then have qualified personnel examine the pump and its required services.
Problem: Material charges slowly from a phase pot.
Possible Cause: Incomplete valve opening, a restricted transfer path, or product viscosity unsuitable for the current temperature and pressure difference.
Recommended Solution: Review the product path and phase condition. Clear a restriction only after isolation and pressure equalization; adjust transfer conditions within the approved process.
Problem: The batch contains visible lumps or uneven texture.
Possible Cause: Inadequate phase preparation, rapid powder addition, or insufficient circulation through the active mixing zone.
Recommended Solution: Compare ingredient preparation, loading order and mixing settings with the approved trial. Inspect the homogenizer only after safe shutdown rather than increasing speed indiscriminately.
Problem: Heating or cooling takes longer than expected.
Possible Cause: Restricted utility flow, poor condensate removal, fouling, or an unsuitable shared utility load.
Recommended Solution: Review supply conditions and valve positions. Have trained personnel inspect the trap, jacket connections and cooling circuit; do not increase pressure beyond the approved limits.
Problem: Product discharge is slow or irregular.
Possible Cause: Rising viscosity during cooling, a restricted outlet, or an unsuitable downstream transfer arrangement.
Recommended Solution: Review product temperature, outlet position and receiving conditions. Assess a selected transfer-pump solution rather than applying unapproved vessel pressure.

Cleaning Method

1. Discharge recoverable product through the approved outlet arrangement.
2. Isolate the equipment from electrical, steam, pneumatic and hydraulic energy before opening or dismantling any part.
3. Equalize vessel pressure through the approved venting procedure.
4. Allow hot product-contact surfaces to reach a safe handling condition.
5. Drain remaining material from the phase pots and connecting product lines.
6. Pre-rinse the product-contact surfaces using media compatible with the product and construction.
7. Apply the established cleaning solution through the main vessel's rotating spray-ball connection where appropriate.
8. Clean the oil and water pots using their approved access and cleaning method.
9. Clean the homogenizer contact zone according to its supplied service procedure.
10. Clean the feed ports, fragrance connection, discharge ball valve and product-transfer path.
11. Remove accessible product-contact parts for separate cleaning where the established procedure requires it.
12. Rinse the cleaned path until it meets the site's specified residue criteria.
13. Sanitize the contact surfaces when required by the product process.
14. Inspect accessible surfaces, scraper contact areas, seals and valve cavities for retained material.
15. Drain and dry the system as required by the production procedure.
16. Record the cleaning inspection before releasing the equipment for the next batch.

Maintenance

Isolate the relevant energy sources and release stored pressure before maintenance. Secure the hydraulic platform against unintended movement before work around its mechanism. Work on electrical controls, lifting equipment and pressure-related components should be performed by qualified personnel.
Inspect the gate agitator, PTFE scrapers and fixed baffles for looseness, damage or abnormal contact. Examine the rotor-stator assembly for wear or product buildup using the access method specified for the fixed-head vessel. Keep service records for abnormal noise, vibration, seal leakage and changing motor load.
Maintain the gearbox and bearings according to their component instructions. Inspect the double mechanical seal and any supplied seal-support connections according to the delivered arrangement. Follow the installed vacuum pump's own service requirements rather than applying a generic oil-change procedure.
Review pneumatic valves, air connections, steam traps and cooling fittings for leakage or impaired operation. Inspect the spray-ball connection and discharge ball valve for deposits. Keep electrical enclosures dry and inspect accessible cables, sensors and emergency-stop devices through the approved maintenance program.
Maintain the hydraulic platform, guardrails, gates and associated protective functions according to the platform documentation and intended lifting duty. Base inspection intervals and replacement decisions on the supplied manuals, operating conditions and recorded wear.

Installation

Position the main vessel, phase pots and operating structure according to the approved layout. Provide a load-bearing base suitable for the equipment, its contents and the platform arrangement. Keep the manway, bottom homogenizer, discharge valve and service connections accessible.
Install the personnel/material lifting platform according to its approved design. Preserve its travel envelope, landing access and protective arrangements. Establish the permitted lifting duty before use; the main vessel head remains fixed.
Connect the equipment to the specified electrical supply through qualified installation personnel. Provide a separate electrical provision for an electric steam generator when that option is selected, because its power is additional to the listed 49kW equipment load. Route the steam supply, condensate handling, cooling circuit, compressed air, process water and drainage to the identified connection points.
Complete the agreed product-transfer connections without imposing unsupported loads on vessel nozzles. Route pipes so that inspection, dismantling and platform access remain available. Implement the specified earthing and utility isolation arrangements.
Commission the installed system using the supplied procedure. Verify drive direction, valve actions, sensors, alarms, vacuum function and heating/cooling behavior under suitable test conditions. Run the homogenizer only with the liquid coverage and seal services required by its manual. Agree the representative-product trial before releasing the system for production.


Optional Spare Parts

Optional spare parts are quoted separately. Any included wear-parts kit is listed in the order confirmation.

Mechanical Seal Assembly
Homogenizer Rotor and Stator Set
PTFE Scraper Blade
O-ring Seal Kit
Rotary Shaft Oil Seal
Silicone Sealing Ring
Deep Groove Ball Bearing


Technical Buyer’s Guide

A 2500L batch system should be selected around the production schedule it must support. This configuration combines a large main vessel, separate phase preparation and a defined access structure. The purchasing decision is therefore about how the full process fits together: ingredient preparation, heating, emulsification, cooling, transfer and changeover. Start with the products and batch patterns that will occupy the system most often, then adapt the engineering around those requirements.

When the 2500L Vacuum Emulsifying Mixer Fits the Batch Plan

This model is a candidate when your intended batch sizes justify 2500L working capacity and separate phase preparation is useful to the process. Its specified 500L minimum batch gives a lower reference point, but that does not make every batch between those figures equally convenient for every formulation. A product that circulates well at one fill level may behave differently at another, particularly during powder incorporation or viscosity development.

Build a schedule around normal demand, occasional peaks and small product variants. If most orders are small and frequent changeovers dominate the shift, a smaller vessel or a combination of vessel sizes may fit better. If larger batches dominate, assess the receiving operation as well: the production benefit depends on being able to cool, transfer and handle the completed batch without creating a queue after the mixer.

Size the Phase Pots Around the Recipe, Not the Sum of Their Volumes

The 1000L oil pot and 2000L water pot provide phase-preparation capacity, not an additional 3000L of finished-batch capacity. Their nominal capacities are also not stated here as usable working volumes. Translate each formulation into an ingredient and phase-loading schedule before deciding whether these proportions suit the project.

Consider where powders dissolve, where waxes melt, which phase receives emulsifiers and which ingredients are added later. A high oil proportion can change the oil-pot duty; a water-heavy formulation can make water preparation the limiting stage. Some ingredients may be charged directly into the main vessel, while others benefit from premixing. The design review should capture those routes instead of assuming both phase pots are filled and emptied completely into every main-vessel batch.

Because the equipment is custom-built, a mismatch in phase proportions is a reason to adjust the design. Provide the phase breakdown and normal batch size so that vessel sizes, connections and operating access can be developed as one arrangement.

Plan Shared Steam Capacity Around Overlapping Duties

The usual one-generator arrangement needs a steam-duty assessment across all three vessels. Preparing oil and water at the same time can reduce waiting within a suitable production method, but only if the available heat supply supports that overlap. The main vessel may also require steam while a preparation pot is being heated for another stage.

Give the engineering team the starting temperatures, target temperatures, ingredient quantities and intended timing. The selected generator and distribution system should reflect the simultaneous duties that actually occur. Counting vessels is not a generator-sizing method, and a specific heating time cannot be promised from the vessel volumes alone.

The listed 49kW excludes the steam generator. For an electric generator, plan its electrical demand separately, together with its feedwater provision. If the factory already has steam, assess a connection to that supply as part of the customized utility design. Steam pressure, condensate handling and jacket duty must be coordinated; the listed 0.3MPa jacket design pressure is not a setpoint for the product chamber.

Treat Cooling and Discharge as Part of the Production Cycle

The useful batch schedule ends when the product has reached the required receiving condition, not when homogenization stops. At this scale, cooling and transfer deserve the same planning attention as heating and high shear. Water temperature, circulation availability, product viscosity and the selected discharge temperature all affect how the batch leaves the system.

Discuss whether the receiving equipment accepts a complete batch or needs a holding stage. A filler with intermittent demand may be better supplied from a suitable intermediate vessel, allowing the mixer to follow its own processing schedule. Direct transfer can also be evaluated, but the two operations need compatible temperatures, flow behavior and timing.

Use the bottom ball-valve outlet as the starting interface. A rotary lobe pump can be selected where product behavior and transfer distance call for assisted movement. Pressure assistance is a separate design choice requiring an approved vessel-pressure duty and safeguards; it must not be inferred from the presence of a compressed-air connection.

Separate the Viscosity Limit from Formulation Approval

The supplied reference lists a maximum processing viscosity of 50,000cP. That figure helps describe the proposed configuration, but it does not capture every material characteristic that matters during a 2500L batch. Temperature-dependent thickening, yield behavior, powder hydration and sensitivity to shear can change the duty substantially.

For a cosmetic cream, examine the conditions during phase combination, homogenization and cooling. For shampoo or shower gel, identify when surfactants and thickeners enter and whether later stages need gentler treatment. For mayonnaise or smooth sauce, review the addition method and formulation-specific structure. These application groups should not share a single default speed and vacuum program.

Provide the most demanding intended formulation and at least one frequent product. Assess the system against the conditions that govern mixing and discharge, rather than selecting a motor solely from the finished product’s room-temperature viscosity.

Define Automation by Actions and Operator Responsibilities

Siemens PLC/HMI control should be specified through the actions it performs. Timers, variable-speed settings, temperature indication, vacuum control, disperser switching, pneumatic valve operation and alarm display form the described control scope. The final sequence can be developed around your operating method.

Document which actions start automatically, which need operator confirmation and which remain manual. Include ingredient charging, phase transfer, late additions, cooling transitions and discharge permissions where relevant. Discuss desired additional functions during engineering rather than assuming that a touchscreen includes recipe storage, batch records or every possible interlock.

A practical operator review also considers who works at the preparation pots, how material reaches the platform and how the team responds to an interrupted batch. This is particularly useful when the line will make different product families with different addition sequences.

Design Access Around a Fixed Head and a Separate Hydraulic Platform

The main vessel uses a fixed top head. The hydraulic platform serves personnel and materials, so its purpose should be reflected clearly in the layout and operating instructions. Treat the platform’s intended duty, rated load, travel, landings and protective arrangement as part of the engineered access system.

Plan ingredient movement from storage to the correct charging point. Keep people, containers and service work clear of the moving platform’s travel zone. For the vessel itself, preserve access to the manway, top fittings, bottom homogenizer and discharge valve. Routine cleaning and component removal need workable routes after all pipes and surrounding equipment are installed.

The listed machine weight is 5000kg; a structural assessment must also consider vessel contents, distributed supports, platforms and operating loads. The liquid density determines product mass. Do not use the 2500L working volume as a kilogram figure or use the listed machine weight alone as the foundation design load.

Compare This Design with the Published 1000L Options

The 1000L fixed vacuum emulsifying mixer with button control is a smaller working-capacity reference with a different operating interface. The 1000L PLC external-circulation emulsifying mixer is another option when the specified return circuit is part of the process requirement. Compare the actual processing route and control scope as well as the vessel size.

DesignWorking capacityDecision focus
Described 2500L system2500LLarger batches, separate phase preparation, Siemens control and project-specific steam/access planning.
1000L fixed-head, button-control model1000LSmaller batch requirements and a button-operated interface.
1000L PLC external-circulation model1000LSmaller batch requirements with a specifically described external return route.

This 2500L reference specifies bottom-entry homogenization; it does not establish an external homogenizing return loop. If that route is needed, include it in the customization brief. A larger vessel alone does not prove finer emulsification or a better fit for the recipe.

Agree Product Trials and Handover Criteria Before Manufacture

Define what successful operation will look like with your products. A useful trial plan covers the intended batch range and the stages most likely to limit performance: phase preparation, powder incorporation, bulk uniformity, air removal, thermal response and final transfer. Agree the methods and acceptance criteria before evaluating results.

  • Identify representative formulations and the intended loading sequence.
  • Assess bulk uniformity using agreed sampling locations and product tests.
  • Observe air content or density where entrained air matters to release.
  • Record temperatures, stage durations and drive behavior during the selected process.
  • Inspect discharge recovery and the effect of downstream transfer on the product.
  • Review cleaning access and retained material after the representative batch.

These are proposed acceptance topics, not a statement that a particular factory test has already been completed. A formal FAT, when required, should have its own agreed procedure and responsibilities.

Review Cleaning Boundaries and Product-Contact Materials Together

A multi-vessel line needs a cleaning review that follows the entire product path. Include the phase pots, feed connections, homogenizer zone, main vessel, discharge valve and selected transfer equipment. The rotating spray ball helps deliver cleaning media inside the main vessel; complete coverage and residue removal still depend on the assembled arrangement and procedure.

Use a material schedule that separates metallic parts from seals, hoses and other nonmetallic components. The specified SUS316L contact-metal construction and internal finish should be evaluated alongside chemical compatibility and cleaning exposure. The 304 versus 316L stainless steel equipment guide provides related background for that materials review.

When one installation will serve both personal-care and food products, include changeover, segregation and cleaning verification in the project discussion. Do not treat a broad application list as proof that any cross-product schedule is acceptable.

Send a Process Brief for a Custom-Built Production System

Specify the required result first, then settle the vessel arrangement and functions around it. For a cosmetic cream and lotion production project, the brief should connect phase preparation with cooling, holding and filling. For sauce and mayonnaise production equipment, include the product structure, ingredient handling and downstream requirements that govern the process.

StriversMachinery can coordinate the main processing equipment and the agreed supporting systems around the factory layout. Send the formulation characteristics, normal and minimum batches, intended schedule, utilities and receiving-equipment information. Include the functions you want changed or added so they can be engineered into the proposal. Free remote technical support is available, while on-site services and project testing are arranged within the agreed scope.