2500L-5000L Vacuum Homogenizing Emulsifier Mixer with Oil Phase Pot and Water Phase Pot for Cream, Lotion, Shampoo, Shower Gel, Sauce and Mayonnaise
The 2500L Vacuum Emulsifying Mixer is a fixed-head batch processing system for compatible creams, lotions, shampoo, shower gel and emulsified sauces. A 2500L working-capacity main vessel combines scraped agitation and bottom-entry homogenization with separate oil and water phase preparation. Within the vacuum emulsifying mixers range, this steam-heated configuration provides a larger-batch platform with Siemens PLC/HMI control and a layout customized around your production process.
- Working Capacity (L)
- 2500
- Main Tank Mixer Type
- Gate Agitator + Single/Dual Fixed Paddles
- Homogenizer Speed (rpm)
- 0–3000 rpm (Variable Speed)
- Contact Material
- SUS316L Stainless Steel
Product Overview
This system brings phase preparation, vacuum charging, emulsification and thermal processing into one coordinated production arrangement. The main vessel provides 2500L working capacity within a 3000L total volume. The specified minimum batch is 500L. A 1000L oil phase pot and a 2000L water phase pot support separate preparation before ingredients enter the main vessel.
Production teams can prepare the two phases in parallel, then follow the formulation’s addition order rather than combining everything at once. The main gate agitator maintains bulk movement while the bottom-entry homogenizer supplies high shear during the required processing stage. Operators supervise ingredient loading, process settings, additions and product release through the Siemens control interface.
This model belongs to the fixed-type vacuum emulsifying mixer family. Its main head remains fixed; the separate hydraulic platform provides personnel and material access. Steam heating is selected for all three vessels, with the generator sized around their combined operating demand.
StriversMachinery builds the project around your formulation, utilities and factory layout. The configuration described here is a reference design for a custom-built system; vessel proportions, controls, handling arrangements and supporting equipment can be adapted during engineering.
Technical Specifications
| Total Capacity (L) | 3000 |
|---|---|
| Working Capacity (L) | 2500 |
| Min Batch Size (L) | 500 |
| Structure Type | Triple Layer (with Jacket & Insulation) |
| Contact Material | SUS316L Stainless Steel |
| Non-contact Material | SUS304 Stainless Steel |
| Surface Finish | Interior Mirror Polish (Ra ≤ 0.4 μm) & Exterior Satin/Matte Finish |
| Temperature Range | Water up to 98°C | Steam up to 120°C | Thermal Oil up to 200°C |
| Jacket Design Pressure (MPa) | 0.3 |
| Main Tank Mixer Type | Gate Agitator + Single/Dual Fixed Paddles |
View All SpecificationsShow Fewer Specifications
| Mixing Speed (rpm) | 0–63 rpm |
|---|---|
| Mixing Motor Power (kW) | 5.5 |
| Frequency Control | Variable Speed with VFD (Delta, Siemens, ABB, Schneider, Optional) |
| Scraper System | Wall-Scraping PTFE Scrapers |
| Homogenizer Position | Bottom-entry Homogenizer |
| Homogenizer Type | High Shear Stator-Rotor Homogenizer |
| Homogenizer Power (kW) | 22 |
| Homogenizer Speed (rpm) | 0–3000 rpm (Variable Speed) |
| Max Processing Viscosity (mPa·s / cP) | 50,000 |
| Heating Method | Electric Heating via Jacket / External Steam Heating (Optional) |
| Cooling System | Tap Water / Cooling Tower Circulation (Chilled Water / Glycol Circulation Optional) |
| Water Chiller | External Water Chiller Unit (Optional) |
| Temperature Control Accuracy | ±1°C |
| Vacuum Degree (MPa) | -0.09 |
| Vacuum Pump Brand | High-quality domestic/joint venture brands |
| Discharge Method | Bottom Valve Discharge (Optional Rotor Pump) / Bottom Valve Discharge (Optional Air Pressure Assist) / External Pump Transfer System |
| Discharge Valves | Ball Valve |
| Mechanical Seal Brand | Double Mechanical Seal (EagleBurgmann) |
| Types of Upper Heads | Fixed Top Head |
| Top Openings & Accessories | Vacuum Port / Vacuum Feeding Port / Powder Feeding Port / Liquid Inlet / Fragrance Addition Port / Manway / Sight Glass with Wiper / LED Inspection Light / CIP Spray Ball / Vent Filter / Vacuum Gauge / Pressure Sensor / Compressed Air Inlet |
| Motor Brand | ABB / Siemens |
| Connection Type | Tri-Clamp |
| Oil & Water Pot | Equipped with Integrated Oil & Water Pre-treatment Pots |
| Oil & Water Pot Capacity (L) | Oil: 1000 L / Water:2000 L |
| Platform & Ladder | SUS Anti-slip Platform with Guardrails & Ladder |
| Voltage | Configurable to local grid (110V–480V, 50/60Hz, Single or 3-Phase) |
| Total Power (kW) | 49 |
| Drive Type | Electric |
| Installation Type | Floor-Standing |
| Automation Level | Fully Automatic |
| Electrical Components | Schneider / ABB / Siemens / Omron / Fuji /Mitsubishi (Optional) |
| Control System | PLC + HMI Touch Screen Control |
| PLC System | Siemens |
| HMI / Touch Screen | Siemens |
| Machine Weight (kg) | 5000 |
Ordering & Delivery
| Warranty | 24 Months | Payment Terms | 40% T/T Deposit, 60% Balance Before Shipment (Alibaba Trade Assurance Available) |
| Lead Time | 15–20 Working Days | Packaging | Standard Export Fumigation-Free Wooden Case |
| OEM / ODM Service | 100% Customizable / Engineering Support Available | ||
Machine Configuration
| Component | Configuration and function |
|---|---|
| Main processing vessel | 3000L total volume; 2500L working capacity; specified minimum batch 500L; fixed top head; jacket and insulation. |
| Agitation | 5.5kW gate agitator, 0–63rpm variable speed, PTFE wall scrapers and two fixed baffles; horizontal geared drive. |
| Homogenization | 22kW bottom-entry rotor-stator homogenizer, 0–3000rpm variable speed; EagleBurgmann double mechanical seal. |
| Phase preparation | 1000L oil phase pot and 2000L water phase pot, each with bottom disperser, temperature probe and baffles. |
| Heating supply | Steam heating for the main vessel and both phase pots. The reference arrangement normally uses one suitably sized steam generator; generator rating is selected for the project. |
| Cooling | Jacket cooling using tap water or cooling-tower circulation; chilled-water arrangements can be selected during customization. |
| Vacuum and feeding | Vacuum pump, vacuum connection, vacuum gauge and ingredient-charging provisions; pneumatic valves on the vacuum-feeding and fragrance-addition ports. |
| Main-head fittings | Manway, observation provisions, inspection light, vent provision, pressure instrumentation, compressed-air inlet, spare connection and rotating cleaning spray ball. |
| Control | Siemens PLC and Siemens touchscreen HMI; variable-speed and timer settings, temperature display, vacuum control, disperser switching, pneumatic-valve actuation and alarm display. |
| Product-contact construction | SUS316L product-contact metal construction; inner mirror polish specified at Ra ≤ 0.4μm; PTFE scraper blades. |
| External construction | SUS304 non-contact construction with satin/matte finish; lug-supported main vessel. |
| Discharge | Bottom ball valve in the reference configuration; rotary lobe pump and pressure-assisted discharge are separately selected options. |
| Access structure | Operating platform, stairs/ladder and guardrails; separate hydraulic access platform for personnel and materials, subject to the approved platform specification. |
| Piping and fittings | Supplied system piping for steam, product/process water, compressed air, cooling circulation and drainage, together with the specified traps, solenoid valves and pneumatic fittings. |
| Electrical load | Listed equipment power: 49kW, excluding the steam generator. Final connected load follows the agreed configuration and electrical schedule. |
Key Features
- Separate oil and water phase pots allow phase preparation to overlap where the formulation permits.
- PTFE wall scrapers return wall-adjacent material to the moving batch during agitation.
- Two fixed baffles interrupt bulk rotation within the main processing vessel.
- Bottom-entry rotor-stator homogenization supplies high shear independently of the gate agitator.
- Steam-heated jackets support coordinated thermal processing across the three-vessel arrangement.
- Vacuum charging provisions support ingredient transfer through defined, valved connections.
- Siemens PLC/HMI brings process settings, valve operation and alarms into one operator interface.
- Fixed-head access fittings provide charging, observation and cleaning connections without routine head lifting.
- A separate hydraulic platform supports personnel and material movement beside the operating structure.
- Bottom ball-valve discharge provides a defined outlet for the selected downstream transfer arrangement.
Applications
Working Principle
Production starts with the ingredients assigned to each preparation stage. Water-phase and oil-phase materials enter their respective pots, where the bottom dispersers incorporate the ingredients. Steam supplies heat through the jackets while the temperature probes provide readings for the operator. The order of loading and heating follows the formulation.
The main vessel’s vacuum system lowers the internal pressure for the selected charging stage. Prepared phases are transferred through the arranged product connections under the pressure difference where their flow properties permit. Pneumatic valves control the specified feeding ports. Powder introduction and fragrance addition use their designated connections at the appropriate stage, rather than following a universal addition sequence.
Inside the main vessel, the gate agitator moves the bulk product past the fixed baffles. PTFE scrapers sweep the wall-adjacent material. When homogenization is required, the bottom rotor-stator head subjects material passing through its working zone to high shear, supporting dispersion and droplet breakup. The agitation and homogenization speeds serve different process functions and can be adjusted separately.
Vacuum treatment can support removal of entrained air during suitable stages. Its timing must account for temperature, foaming and volatile ingredients. Cooling water then circulates through the jacket as required by the process. Finished product leaves through the bottom ball valve, with an optional transfer pump or engineered pressure-assisted arrangement when selected. The spray ball supports the subsequent cleaning procedure.
Why Choose This Machine
- A coherent route for larger batches. The 2500L working-capacity vessel provides a production option when repeated smaller batches create handling and scheduling pressure, while retaining separate phase preparation.
- Preparation can be planned around the recipe. The oil and water pots let teams organize melting, dissolution and premixing before main-vessel processing, instead of treating every ingredient as a direct main-tank addition.
- Bulk movement and high shear have separate roles. Independent drives let the process use wall scraping and homogenization at different stages, including stages where additional shear is unnecessary.
- Controls can follow the operating method. Siemens PLC/HMI provides a basis for the agreed valve actions, timing and operator interface, with the automation scope tailored to production requirements.
- Access planning includes material movement. The fixed operating structure and separate hydraulic platform can be arranged around charging and personnel access, reducing the need to improvise handling routes after installation.
- Transfer can match the receiving operation. The bottom outlet can be combined with a selected pumping or pressure-assisted solution according to the product and downstream layout.
Optional Upgrades & Configurations
Installation Requirements
Listed Equipment Power: 49kW, excluding the steam generator.
Heating Supply: Steam for the main vessel, oil phase pot and water phase pot; normally one project-sized steam generator.
Compressed Air: Supply for the pneumatic valves.
Process Water: Water quality suitable for the formulation.
Cooling Water: Tap-water or cooling-tower circuit, or a selected chilled-water arrangement.
Cleaning Water: Supply to the agreed cleaning connections.
Drainage: Connection for cleaning discharge and the specified utility drains.
Installation Base: Load-bearing floor or foundation sized for the installed operating loads.
Access: Working clearance for the fixed-head vessel, phase pots, operating structure, hydraulic platform and maintenance tasks.
Frequently Asked Questions
What is the 2500L Vacuum Emulsifying Mixer supplied as?
Can the functions and layout be customized?
Are the three vessel capacities added together to give the batch size?
Can this configuration process a 500L batch?
Does steam heating require three steam generators?
View All FAQs (18)Show Fewer FAQs
Does the listed 49kW include steam generation?
Does the hydraulic platform lift the main vessel head?
Is discharge through a pump included in the reference configuration?
Can the mixer make both cream and shampoo?
Is the maximum viscosity specification enough to approve a product?
Does a higher homogenizer speed always improve the finished emulsion?
Does vacuum remove every bubble and guarantee shelf stability?
Does Siemens PLC control mean the system operates without staff?
Can one steam generator heat all three vessels at the same time?
Is the spray ball a complete automatic CIP system?
Can the line produce smooth sauce and mayonnaise?
What should be tested before accepting a 2500L installation?
What technical support is available after delivery?
Ready to Get a Quote?
Contact our team directly for pricing, customization options, and delivery timelines.
💬 WhatsApp Us NowRecommended Accessories & Utilities
After-Sales & Technical Support
Common Problems
During operation, observable symptoms may include a slow vacuum drawdown, loss of vacuum during charging, interrupted transfer from a phase pot, visible powder lumps, uneven texture or a persistent surface foam layer.
A batch may take longer than its established heating or cooling pattern, or the indicated temperature may fluctuate unexpectedly.
Operators may notice an unusual change in drive noise, vibration or displayed load, material remaining on the vessel wall, leakage near a seal or valve, or slow discharge into the receiving equipment.
Pneumatic valves may fail to reach the commanded position, and the HMI may display an alarm or an unexpected process state.
Record when each symptom appears, the product being processed and the last normal stage so that troubleshooting starts from an identifiable observation.
Troubleshooting
Problem: The main vessel does not reach or hold the expected vacuum.
Possible Cause: An open connection, leaking access seal or valve, or insufficient vacuum-pump performance.
Recommended Solution: Inspect the valve lineup and accessible seals first. Compare the vacuum reading with the last normal run, then have qualified personnel examine the pump and its required services.
Problem: Material charges slowly from a phase pot.
Possible Cause: Incomplete valve opening, a restricted transfer path, or product viscosity unsuitable for the current temperature and pressure difference.
Recommended Solution: Review the product path and phase condition. Clear a restriction only after isolation and pressure equalization; adjust transfer conditions within the approved process.
Problem: The batch contains visible lumps or uneven texture.
Possible Cause: Inadequate phase preparation, rapid powder addition, or insufficient circulation through the active mixing zone.
Recommended Solution: Compare ingredient preparation, loading order and mixing settings with the approved trial. Inspect the homogenizer only after safe shutdown rather than increasing speed indiscriminately.
Problem: Heating or cooling takes longer than expected.
Possible Cause: Restricted utility flow, poor condensate removal, fouling, or an unsuitable shared utility load.
Recommended Solution: Review supply conditions and valve positions. Have trained personnel inspect the trap, jacket connections and cooling circuit; do not increase pressure beyond the approved limits.
Problem: Product discharge is slow or irregular.
Possible Cause: Rising viscosity during cooling, a restricted outlet, or an unsuitable downstream transfer arrangement.
Recommended Solution: Review product temperature, outlet position and receiving conditions. Assess a selected transfer-pump solution rather than applying unapproved vessel pressure.
Cleaning Method
1. Discharge recoverable product through the approved outlet arrangement.
2. Isolate the equipment from electrical, steam, pneumatic and hydraulic energy before opening or dismantling any part.
3. Equalize vessel pressure through the approved venting procedure.
4. Allow hot product-contact surfaces to reach a safe handling condition.
5. Drain remaining material from the phase pots and connecting product lines.
6. Pre-rinse the product-contact surfaces using media compatible with the product and construction.
7. Apply the established cleaning solution through the main vessel's rotating spray-ball connection where appropriate.
8. Clean the oil and water pots using their approved access and cleaning method.
9. Clean the homogenizer contact zone according to its supplied service procedure.
10. Clean the feed ports, fragrance connection, discharge ball valve and product-transfer path.
11. Remove accessible product-contact parts for separate cleaning where the established procedure requires it.
12. Rinse the cleaned path until it meets the site's specified residue criteria.
13. Sanitize the contact surfaces when required by the product process.
14. Inspect accessible surfaces, scraper contact areas, seals and valve cavities for retained material.
15. Drain and dry the system as required by the production procedure.
16. Record the cleaning inspection before releasing the equipment for the next batch.
Maintenance
Isolate the relevant energy sources and release stored pressure before maintenance. Secure the hydraulic platform against unintended movement before work around its mechanism. Work on electrical controls, lifting equipment and pressure-related components should be performed by qualified personnel.
Inspect the gate agitator, PTFE scrapers and fixed baffles for looseness, damage or abnormal contact. Examine the rotor-stator assembly for wear or product buildup using the access method specified for the fixed-head vessel. Keep service records for abnormal noise, vibration, seal leakage and changing motor load.
Maintain the gearbox and bearings according to their component instructions. Inspect the double mechanical seal and any supplied seal-support connections according to the delivered arrangement. Follow the installed vacuum pump's own service requirements rather than applying a generic oil-change procedure.
Review pneumatic valves, air connections, steam traps and cooling fittings for leakage or impaired operation. Inspect the spray-ball connection and discharge ball valve for deposits. Keep electrical enclosures dry and inspect accessible cables, sensors and emergency-stop devices through the approved maintenance program.
Maintain the hydraulic platform, guardrails, gates and associated protective functions according to the platform documentation and intended lifting duty. Base inspection intervals and replacement decisions on the supplied manuals, operating conditions and recorded wear.
Installation
Position the main vessel, phase pots and operating structure according to the approved layout. Provide a load-bearing base suitable for the equipment, its contents and the platform arrangement. Keep the manway, bottom homogenizer, discharge valve and service connections accessible.
Install the personnel/material lifting platform according to its approved design. Preserve its travel envelope, landing access and protective arrangements. Establish the permitted lifting duty before use; the main vessel head remains fixed.
Connect the equipment to the specified electrical supply through qualified installation personnel. Provide a separate electrical provision for an electric steam generator when that option is selected, because its power is additional to the listed 49kW equipment load. Route the steam supply, condensate handling, cooling circuit, compressed air, process water and drainage to the identified connection points.
Complete the agreed product-transfer connections without imposing unsupported loads on vessel nozzles. Route pipes so that inspection, dismantling and platform access remain available. Implement the specified earthing and utility isolation arrangements.
Commission the installed system using the supplied procedure. Verify drive direction, valve actions, sensors, alarms, vacuum function and heating/cooling behavior under suitable test conditions. Run the homogenizer only with the liquid coverage and seal services required by its manual. Agree the representative-product trial before releasing the system for production.
Optional Spare Parts
Optional spare parts are quoted separately. Any included wear-parts kit is listed in the order confirmation.
Mechanical Seal Assembly
Homogenizer Rotor and Stator Set
PTFE Scraper Blade
O-ring Seal Kit
Rotary Shaft Oil Seal
Silicone Sealing Ring
Deep Groove Ball Bearing
Technical Buyer’s Guide
Recommended Machines
Get Your Download Link
Please fill in your details and we'll send the download link to your email.








